Project 03 · Water & health

Water at the School Gate

Boreholes, hand-washing stations and health outreach, so no child walks kilometres before class.

Partially funded2026 budget · $20,000Bulopa, Kamuli District
Children carrying yellow jerrycans of water beside a brick wall.
Fetching water before school

The problem

The school day begins with a walk for water.

Children come to school after fetching water. The walk is seven to nine kilometres. The water is carried in jerrycans; the youngest children carry the smallest containers.

The first borehole is working. A second is needed for the growing school and the surrounding households, and hand-washing has to be kept supplied.

What this project funds

Borehole 2 and the things around it.

2026 quotations in US dollars. Every line is tied to a purchase the school can receipt.

Borehole 2
A second borehole for the school and surrounding households.$9,000
Hand-washing stations
Soap and water outside the latrines and kitchen.$3,000
Pump maintenance training
A local committee trained to service the pump.$2,000
Community health outreach
Visits, referrals and hygiene sessions.$3,000
Spare parts
Washers, bolts and the parts that wear out.$1,500
Water committee training
Record-keeping and small repairs.$1,500

Budget & target

$20,000 for 2026.

Partially funded. The remaining gap is the next funder's opportunity.

2026 budget

Partially funded
2026 budget$20,000 target
Water at the School Gate 2026 budget
ItemCostStatus
Borehole 2 and pump$9,000Funding gap
Hand-washing stations$3,000Ongoing
Pump maintenance training$2,000Ongoing
Community health outreach$3,000Ongoing
Spare parts$1,500Ongoing
Water committee training$1,500Ongoing
Total$20,000

The meter is updated from the school's records. A goal is shown only when the school committee has signed the quotation.

How we will verify it

What a donor can ask to see.

Verification is a habit of keeping paper, not a paragraph in a proposal.

  1. The drilling log and water-quality test. Depth, yield and a test showing the water is safe to drink.
  2. Dated photographs of the works. The pump, apron, drainage and hand-washing station.
  3. Pump committee records. Who is trained, who holds the key and how repairs are reported.
  4. Receipts and the contractor's handover note. Kept at the school and shared with the funder.

Timeline

From the first class to 2026.

Dates are recorded where they matter. The next phase is not dated until it is funded.

2023

Borehole 1

The first borehole is drilled and handed to a trained committee.

2024

Hand-washing

Stations are built outside the latrines and kitchen.

2026

Borehole 2

A second borehole is needed; the quotation is signed and waiting for a funder.

Sustainability

What happens when the grant ends?

A pump that is not maintained is a pump that stops. The budget includes the training and the spare-parts fund that keep it working.

The school management committee nominates a small pump committee, including at least one teacher and one parent. The committee keeps the tools and calls the contractor for anything beyond a minor repair.

$20,000the 2026 budget for this programme.
1,160+children in school while the work continues.

Fund this project

Put the water inside the gate.

We are seeking a funder for the second borehole, and smaller gifts toward hand-washing and the spare-parts fund. Two boreholes cost $10,000 when the sites are drilled together.